Stanwood Manor Condominiums are located at 10090 SW Beaverton-Hillsdale Hwy., Beaverton, OR 97005. Originally built in 1964 as 32 apartments, they were converted to condos in 1978.
Major Milestones
In addition to all the monthly maintenance and emergency issues the Board of Directors manages, below are some major milestones for the community as a whole.
2017
- Converted all flood lights on building A to LED.
2016
- Converted large flood light attached to building C that over looks middle parking light to LED unit.
- Large tree removed from in front of unit #20.
- Removed four dying arborvitae from in front of pool on the lower level.
- Installed white vinyl fencing were arborvitae were removed in front of pool.
- Changed property management companies.
2015
- Removed dead trees near building D.
- Replaced broken storm drain grate in front of building A.
- Replaced wooden stairwell to laundry room in building C.
- Upgraded all light post and laundry room overhead lights to LED bulbs.
2014
- Removed two older silver maple trees between buildings B and C and planted six new dogwood tress throughout the property.
- Replaced the wooden stairwell between buildings D and E.
- Four new adirondack chairs and four new loungers were added to the pool.
- Replaced gate valve (water shut off) in front of building B.
- New emergency 911 phone was installed adjacent to the pool house (hardwired).
2013
- Replaced fence on upper level between parking lot and neighboring property
- Replaced metal railing on staircase between upper and middle levels
- Swimming pool pump was replaced
- Resurfaced swimming pool
- Resealed all parking lots
2012
- Finished last phase of replacing all upper decks
- Added safety mirrors at the end of upper and middle driveways
- Installed gutters and repaired fascia boards on building C and E
- Converted “PGE Room” in building B to “Utility Room” per PGE requirements (removed walls to allow access to meter reading)
2011
- Buildings A, B, and C were painted
- New metal doors and electronic door locks were put on all laundry and utility room doors
2010
- New Metal roofs installed on buildings B, D and E
- Buildings D and E were painted
- All upper level decks on Buildings A, C, D and E have been reengineered
2009
- Emergency 911 only phone was installed at the pool
2008
- New TPO Thermoplastic roofs installed on buildings A and C